Scheduled Preventative Maintenance
All University room entry protocols and policies will be followed as this required preventative maintenance is completed in all student rooms on a rolling six-month basis whether the student room is currently occupied or vacant. Signs will be posted in the building to inform students when preventative maintenance is to be completed.
精东影业following is a list of tasks that will be completed during this scheduled preventative maintenance:
-
Fan Coil Units
-
A full inspection of the HVAC unit in the room
-
Lubrication and cleaning including the motor, FCU inside and out top and bottom compartments, return ductwork and registers
-
Inspection of the drain pan, flush and prime drain line, install algaecide tablets
-
Inspect coils for leaks, check control valves for proper operation, inspect coil fin condition and sweep, clean coil as needed
-
Check motor electrical connections and wiring, mounting brackets and hold downs bolts, check and clean motor vent, check bearings and blower wheel
-
Replace filters, fan blower wheel and shaft, check fan blades and moving parts for excessive wear, and clean as needed
-
Clean the exterior of the HVAC unit, restart, bleed all air out of risers for the building, check unit thermostat and operation
-
-
Electrical
-
Ensure all lighting is operating as designed
-
Ensure outlets are operating as designed
-
Ensure wiremold is secure and not damaged
-
Ensure any room automation is operating as designed where applicable
-
-
Bathrooms
-
Ensure robe hooks or towel bars are secure
-
Ensure soap dispensers work properly
-
Ensure toilet paper dispenser is secure
-
Ensure ADA hardware is secure
-
Ensure faucets and shower valves work properly
-
Ensure shower doors and latches work as designed
-
Inspect caulking and replace as needed
-
Inspect shower door sweep
-
Ensure all drains operate as designed with maximum waterflow
-
Ensure toilets flush and fill normally
-
Inspect flooring
-
Verify lighting is working properly
-